1 Answer. It depends on where the drip edge is. At the side, or gabels, of a roof, the drip edge goes over the roofing felt. At the bottom of the roof, the drip edge goes under the roofing felt.
Do you install drip edge before or after shingles?
Can Drip Edge Be Installed After Shingles? The most popular time to install a drip edge is when new shingles are installed. However, the drip edge can be installed at any time. The materials involved include: a ladder, a flat pry bar, a hammer, tin snips, eave stripping, and galvanized roofing nails.
What is the proper overhang for roof shingles?
The edge of the shingles should hang over a roof between an inch and an inch and a half — or between a half inch and three-quarters of an inch if drip edge flashing is installed. Too much overhang and the shingles could blow off in high winds; too little can allow water to seep into rake or fascia boards.
Do you install drip edge before fascia?
The correct placement of a roof drip edge is on top of the roof’s exterior cover directly between the sheathing and the fascia board, which forms a drainage gap between the drip edge and the fascia board. As a result, the drainage improves water flow and protects the roof from potential water damage.
Where should drip edge be installed?
Drip edge is installed around the whole perimeter of the roof. It is used to hold the underlayments down and create a watertight seal around the edge of the roof. Only the face of the metal is seen and is usually just white one to one and half inch stripe located right under the shingles and above the fascia.
Do you nail or staple roofing felt?
Some roofers prefer to attach felt underlayment with 1-inch roofing nails or special nails with plastic washers, but most codes allow staples, which are easier to drive.
Is a drip edge necessary on a roof?
Without a drip edge, water may end up beneath the shingles and may cause damage to various parts of the home. Though your home may not have originally had a drip edge installed, drip edges are now required by most building codes across North America to protect homes from damage.
Is a drip edge necessary on a shed?
Shed roof drip edge is essential in keeping your structure watertight. However, there are tons of ways to mess up a drip edge installation. For instance, nailing drip edge too close to your shed will still allow drips down the fascia board.
How far should shingles overhang drip edge?
Shingles should not extend more than 3/4” (19 mm) past the drip edge. If shingles overhang the edge of the roof by more than 3/4” (19 mm), then they are not supported and may crack and break off. In addition, the wind resistance at the roof edge may be compromised.
How do you finish the top edge of a shed roof?
- For the final row, cut shingles into strips.
- Ensure strips are wide enough to cover nails.
- Install your strips.
- Apply sealant over exposed nails on the last strip.
- Use more sealant along the top edges of all shingle strips.
Article first time published on
Do you nail drip edge to fascia?
Nail thefurring strip to the fascia board near the fascia top – tight under any extending of roof decking (usually absent); the Drip edge will be installed 1/8″ proud of (away or out from) the furring strip in best practice or may be installed tight against the furring strip (reduces the life of the furring strip by …
Should gutters go behind drip edge?
It is recommended that gutters are placed under or ‘behind’ the drip edge of your roof. … If gutters are installed below the drip edge, water can drip behind the gutter and cause damage to the wood supporting the gutter system.
Should there be a gap between roof and fascia?
The best installation method is to leave a gap between the drip edge and the fascia board, about the width of a finger. The shingles should also overhang the drip edge 3⁄8 to 1/2 an inch.
What is roofing drip edge?
Drip edge is metal flashing installed at the edges of the roof to keep water away from your fascia and from getting underneath your roofing components. If your roof doesn’t have drip edge, water gets behind your gutters and rots out both your fascia board and roof decking.
How much should a starter overhang for shingles?
Starter shingles should always overhang the eave and rake edges of the roof by about 1/4″-3/4″ to ensure adequate rain water drainage. It is also important that the seal strip is placed facing up and close to the edge of your roof; otherwise, your roofing system won’t seal properly.
How much should shingles overlap?
Overlap each row at least 3 to 4 inches. If you live in an area with inclement weather, you should consider using a special leak barrier protector. Then, install new flashing (metal flashing is often called “drip edge” along the bottom of the roof near your gutters) and starter shingles at the edges.
Can you install new drip edge over old drip edge?
Replacing Drip Edge Eave Strips: Align one end of the lower eave strip even with the edge of the roof decking. Lift up roof shingles, and nail the eave strip in place with galvanized roofing nails. Overlap the other pieces of eave strip by at least 1” and nail them in place.
Does a metal roof need a drip edge?
A drip edge is not needed for metal roofing. If you make sure to overhang your metal roofing at least an inch, the drip edge is not necessary at the eaves and rakes. If the metal roof is hanging over an inch, the water will be directed away from the fascia anyway if at a slant.
Do you overlap roofing felt?
Remember to leave a 2″ overlap. Drive about five nails in the top right-hand corner and roll out the felt about halfway (perhaps 25 feet) across the roof. Stand on the first course of felt and work with the second course of felt above you. It is not necessary to completely nail the top edge of the course.
What nails do you use for roofing felt?
Galvanised nails can be used in a wide range of applications, but are most commonly used in the installation of asphalt shingles and felt on outbuildings, sheds and more – wherever adverse weather conditions are common, galvanised nails are a good choice.
Which side of roof felt goes down?
Direction. When laying sheets of tar paper, always lay the sticky, glossy side down. Tar paper’s two sides are noticeably different. One side is somewhat sticky, though don’t expect it to leave a glue-like residue on your hands.
Does drip edge go on rakes and eaves?
A drip edge should be installed on the eaves and rakes of the roof, flush with the decking and fascia. On eaves, the drip edge is installed directly to the deck with underlayment installed over it for proper water shedding. On rakes, the underlayment is installed over the drip edge.