How do you install drip edge on a deck

Installing roof drip edge flashing properly The best way is to install the roof drip edge only along the eaves first, then place ice-and-water barrier (in the snowbelt) or felt paper (underlayment) over the drip edge.

Is drip edge installed over or under felt?

Installing roof drip edge flashing properly The best way is to install the roof drip edge only along the eaves first, then place ice-and-water barrier (in the snowbelt) or felt paper (underlayment) over the drip edge.

How do you put flashing on a deck?

To add flashing, first remove the deck board that runs alongside the house. If the boards run diagonally, snap a chalk line 5-1/2 in. from the house, then set the blade in a circular saw to the depth of the decking boards and cut off the board ends. (Replace the cutouts at the end of the job with a 5-1/2-in.

Do you nail down drip edge?

Owens Corning™ Roofing recommends installing drip edge on all roofs to be covered with asphalt shingles. … Nail the drip edge to the roof deck with minimum 12-gage roofing nails spaced 8 to 10-inches on center and 1-½ to 3-inches from the edge of the sheathing. Adjacent drip edge pieces should be lapped minimum 2 inches.

Should drip edge be tight to fascia?

That flange provides a base for nailing the drip edge to the sheathing. A vertical drip edge lip extends down roughly 1 5/8″ and as Steve points out, should not be set tight against the fascia board or water may run behind the gutter and down the fascia, inviting leaks and rot.

Does drip edge go under tar paper?

The drip edge should be over the paper at the eaves, and under along the rake. mroberson: Its a TRAP! Back in my construction days, I learned that you place the tar paper OVER the drip edge on the eaves so if moisture gets through the shingles, it does not get under the drip edge.

How far should shingles hang over the drip edge?

Shingles should not extend more than 3/4” (19 mm) past the drip edge. If shingles overhang the edge of the roof by more than 3/4” (19 mm), then they are not supported and may crack and break off. In addition, the wind resistance at the roof edge may be compromised.

What kind of nails do you use for drip edge?

The drip edge is nailed in place using 1-1/2 galvanized roofing nails. A felt-tip marker works great for marking cuts. And, again, prying open the end with a small flat bar allows the pieces to overlap cleanly.

Does underlayment go under drip edge?

According to most building codes and manufacturer recommendations, the drip edge should be installed beneath the underlayment along the eaves of the roof. But over the underlayment along the rake edges of the roof. Understanding the proper way to install the drip edge will only get you so far.

Can you staple drip edge?

Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof. … Staple it to the plywood with a staple gun, placing the staples at 6- to 8-inch intervals along the edges and in the middle of the paper.

Article first time published on

Can you replace drip edge without removing shingles?

The drip edge is often replaced when new shingles are installed, but it can be replaced at any time. Asphalt roof shingles can become brittle in cold weather, so wait until a warm (but not hot) day to remove and replace eave stripping.

Do you need flashing on a deck?

“Flashing is required where exterior porches, decks, or stairs attach to a wall or floor assembly of wood frame construction.

Is deck flashing necessary?

Water gives life. … When a waterproof deck lacks a proper flashing system, water from the roof can easily find its way inside rough surfaces into various parts of the house. Flashing ensures instances of wood or plywood rot are unheard. The wood structure remains dry since the flashing takes away all the water.

How do you attach flashing to wood?

Install a tube of construction adhesive in a caulking gun. Apply a generous amount of adhesive along the back of both fins of the flashing. Reposition the flashing at the deck-to-wall intersection and align the cuts at the lower edge with the sides of the corresponding joists. Press the flashing firmly into place.

What is the purpose of deck flashing?

Deck flashing creates a barrier to prevent moisture from entering the house in the openings you create when attaching your ledger board connection. You can buy flashing either in roll form or in rigid Z- or L-shaped 10′ sheets made of stainless steel, copper or vinyl material.

How do you use a deck flash barrier?

When applying to the tops and ends of deck joists, center over joist. Remove release paper and press in place. Firmly crease and fold Deck Flash Barrier over both sides of the joist. To maximize adhesion, roll with a small hand roller.

Should gutters go behind drip edge?

It is recommended that gutters are placed under or ‘behind’ the drip edge of your roof. … If gutters are installed below the drip edge, water can drip behind the gutter and cause damage to the wood supporting the gutter system.

Can you install drip edge after shingles?

Can Drip Edge Be Installed After Shingles? The most popular time to install a drip edge is when new shingles are installed. However, the drip edge can be installed at any time. The materials involved include: a ladder, a flat pry bar, a hammer, tin snips, eave stripping, and galvanized roofing nails.

How much does it cost to install drip edge?

The standard drip edge used (aluminum) is going to be around $2.00 a linear foot, including labor to install. If you upgrade to a different metal (steel or copper), it’s going to cost even more.

What size drip edge should I use?

Metal Edge Drip: A drip edge has to be resistant to possible corrosion and should be 36 gauge or larger.

What do roofers use to cut shingles?

Roofers need utility knives or roofing hook blades for many jobs, including as shingle cutters. If you install 3-tab shingles, you’ll need to cut the shingles in sections to form hip and ridge shingles. No matter which shingle you use, you’ll also need to cut a roof underlayment as well as an ice and water protector.

Does fascia go on before shingles?

If your roofers are replacing your fascia board as part of a full roof replacement, then they will install the new shingles before they address the fascia. There is no way to replace the fascia board without removing the gutters, as the gutters are mounted to the board.

Which side of tar paper goes down?

When laying sheets of tar paper, always lay the sticky, glossy side down. Tar paper’s two sides are noticeably different. One side is somewhat sticky, though don’t expect it to leave a glue-like residue on your hands. The other side is smooth like paper, and typically contains lettering and line markings.

Is drip edge and flashing the same thing?

Drip edges are metal sheets, usually shaped like an “L,” installed at the edge of the roof. Also called drip edge flashing or D-metal, they serve a vital function by directing water away from the fascia and into the gutter.

Is metal drip edge required by code?

The IRC now requires a drip edge for all asphalt roof installations and provides direction for its proper installation. Underlayment must lap over the drip edge at the eaves. At the rake edges (the sloped edges that are referred to as “gables” in the code text), the drip edge must be installed over the underlayment.

Do shingle manufacturers require drip edge?

A drip edge is required to be provided at the eaves and rakes of asphalt shingle roof systems. A drip edge’s flange should extend back onto the roof surface a minimum of 2 inches.